Sunday, March 14, 2010

announcement: TLW work in progress exhibition - 3.22



The Living Wall exhibition:
in-progress work from phases 1 and 2

Hayes Hall Lobby
School of Architecture and Planning, South Campus

Opening Reception:
March 22, 5:30 - 7:30 pm
On view through April 2

Friday, March 5, 2010

Phase 2 Review

Phase 2 review
28 projects - groups of 3-4 (scale: 3" = 1'-0")

Individual projects from phase 1 were organized into a single scheme combining the strengths of earlier proposals . The goal of phase 2 is to be able to disassemble and pack each unit as blocks considering the transportation of units in smaller / lighter fragments.




Friday, February 19, 2010

Phase 1 Review

Phase 1 review.
First wave of design proposals - 100 inhabitable dwellings.

All projects began with a solid volume of blue foam measuring 6'x6'x8' (1"=1'-0" scale).
Volumes were cut, shifted, and rotated to provide an area for entry, internal circulation, and sleeping areas for 3-7 people. Final models for this phase were the result of a translation from solid to planar materials allowing the massing studies to become inhabitable while maintaining their volumetric identities.




Monday, February 1, 2010

Hello World




This blog was created to mark the progress of The Living Wall; a first year design / build project at the State University of New York at Buffalo, School of Architecture.