
Wednesday, April 7, 2010
Wednesday, March 24, 2010
Phase 3 Review
Phase 3 review
Due to the size, shape, and formal complexity of the modules, a typical load bearing structural system could not be applied to the projects. Thus, the proposed method of fabrication required an investigation of the module as a self-supporting structural component.

14 projects - groups of 6-7 (structural studies at 1"=1'-0" and full-scale detail mock-ups)

Tuesday, March 23, 2010
Sunday, March 14, 2010
announcement: TLW work in progress exhibition - 3.22
Friday, March 5, 2010
Phase 2 Review
Phase 2 review
Individual projects from phase 1 were organized into a single scheme combining the strengths of earlier proposals . The goal of phase 2 is to be able to disassemble and pack each unit as blocks considering the transportation of units in smaller / lighter fragments.

28 projects - groups of 3-4 (scale: 3" = 1'-0")
Friday, February 19, 2010
Phase 1 Review
Phase 1 review.
First wave of design proposals - 100 inhabitable dwellings.
All projects began with a solid volume of blue foam measuring 6'x6'x8' (1"=1'-0" scale).
Volumes were cut, shifted, and rotated to provide an area for entry, internal circulation, and sleeping areas for 3-7 people. Final models for this phase were the result of a translation from solid to planar materials allowing the massing studies to become inhabitable while maintaining their volumetric identities.Monday, February 1, 2010
Hello World
Subscribe to:
Posts (Atom)

